Location | Hospital

Military Hospital Salalah Project | Daan Shaaban Construction

Military Hospital

The works comprise extension of first floor in existing hospital building area, demolishing of parapet wall, removal of water proofing on roof slab, construct RCC structure, electromechanical works, upgrading of existing low voltage system, tapping the existing service lines and external services as required to fulfill the project requirements

Scope of Work

The Military Hospital project in Salalah is an extension and enhancement of an existing hospital building. This project involves extending the existing hospital's first floor and providing the systems required for the additional space. To get ready for the new construction, it was necessary to take some of the existing parts of the building. This included the removal of the existing waterproofing material in the roof slab and the removal of the parapet wall. Following the necessary preparatory work, a new RCC structure is built. The new extension is made up of RCC (Reinforced Cement Concrete) which gives the necessary strength to the structure. Electromechanical works were also included in the project. These works are crucial in delivering services for the new area of the hospital. The other portion of the project involved the upgrading of the existing low-voltage system. New works are also connected to the existing service lines of the hospital, as part of the project. These connections are placed to facilitate the new extension for services. Additionally, external services were offered as needed for the project. For the new development these works were given for assistance with the connection and support of the development to the existing hospital infrastructure.

Our Role

Daan Shaaban helped the client manage costs across a mix of demolition work, roof repairs, new construction, and electrical upgrades. We also prepared clear paperwork for each part of the job and checked key stages of the work, especially the new waterproofing and electrical systems, to make sure everything met the right standard before it was approved.

Result

The Military Hospital Salalah project involves a range of activities, such as Demolition, Structural Construction, Electrical Upgrade, Electromechanical and Service Connections. The project is not just about constructing a new hospital, it's about maximizing the potential of the existing facility by identifying and enhancing key spaces. The Military Hospital Salalah now has more space and better systems, thanks to a construction process that was carefully planned to work safely alongside a hospital that never stopped running.

Back To All Projects